中國招商引資信息網(wǎng),招商引資信息網(wǎng),招商引資網(wǎng),招商投資網(wǎng),招商網(wǎng),招商投資集群,招商投資全球集群,招商投資全球集群總站,
霸州開發(fā)區(qū)招商引資網(wǎng)
廊坊市招商引資項(xiàng)目匯總468—18
來源:網(wǎng)群國際    瀏覽:

Desalination equipment export base construction Projects

 

Project contentThe Projectplanned to be located in the east of Canal Road, south of the junction of Tianjin Wuqing, west of Prospect Company, north of Cheyenne Road. The total planned land area of 500 acres, in which the warehouse area of 400 acres, the planned plant construction area of 25 square meters. R & D and living area covers 100 acres, planned R & D building and the dormitory building area of 40,000 square meters.

Investment and funding sourcesa total investment of 1.45 billion yuan, all use of extra funds.

Market analysisThe Projectwas introduced in Germany and Spain, investment and production in addition to leading water companies outside of the filtration equipment related products, such as cleaning equipment, recycling equipment, and other trace elements, form a relatively complete industrial chain.

Economic BenefitsThe annual output value of annual output value of 1.3 billion yuan, profit 372.04 million yuan, taxes of 110.08 million yuan, it can accommodate 1,100 people in employment.Chinese enterpriseLimited, registered capital of 100 million yuan

CooperationSole

 

ContactTong Ming-Shun

PositionDeputy Director of Development Zone Xianghe

AddressPeace Avenue south of Xianghe Zone

Tel0086-316 -821***

FAX0086-316-821***

Post Code06***

Websitewww.**qlgk.lfgov.cn/xiangzheng11

 

The Projectof New Energy Automotive Manufacturing

 

Project ContentThe Projectin the park will produce new energy automobile products, expected to produce various types of new energy vehicles can reach 20000 units.

Investment Estimation and Fund SourceThe total investment of the Projectis 0.8 billion dollars.

Market AnalysisCurrently basing on international energy situation, the new energy very ,vehicles become popular. So far, the capacity of 3% new energy vehicles cant meet the market demand of 10% , so it has broad market space.

Construction ConditionsXianghe emerging industry demonstration zone, close to the jingha highway exit, so the transportation is convenient, the implemented nine on a flat, construction conditions are ripe.

Benefit AnalysisAfter the construction of this Project, the yearly output value can reach 500 million dollars with the profit of 300 million dollars.

General Description of Chinese SponsorXianghe emerging industry demonstration zone is in the east of Beijing of 38 kilometers, close to jingha highway exit. With the provincial road in the zone, the transportation is convenient, and the investment environment is superior.

Cooperative FormJoint stuck, cooperation, sole proprietorship

 

Contact personZhu Aili

TEL0086-316-833***

FAX0086-316-887***

AddressHebei Xianghe Emerging industry demonstration zone

E-mailmix**[ta]**fq.com.cn

 

The Projectof Spectral Analysis Making Instrument

 

Project ContentThe Projectin the park will produce spectral analysis making instrument, expected to produce various types of spectral analysis instrument can reach 50000 units.

Investment Estimation and Fund SourceThe total investment of the Projectis 0.75 billion dollars, all self-raised funds for the enterprise.

Market AnalysisSpectrum analysis instrument is the basic use of foreign technology.With the development of a series of new and high technology industries, demand for spectrum analysis instrument proportion rises year by year, the domestic market demand.

Construction ConditionsXianghe emerging industry demonstration zone, close to the jingha highway exit, so the transportation is convenient, the implemented nine on a flat, construction conditions are ripe.

Benefit AnalysisAfter the construction of this Project, the yearly output value can reach 500 million dollars with the profit of 300 million dollars.

General Description of Chinese SponsorXianghe emerging industry demonstration zone is in the east of Beijing of 38 kilometers, close to jingha highway exit. With the provincial road in the zone, the transportation is convenient, and the investment environment is superior.

Cooperative FormJoint stuck, cooperation, sole proprietorship

 

The Projectof Manufacturing auto transmission

 

Project ContentAuto transmission manufacturing Projectconstruction in the park, the production of automatic mechanical transmission (ATM) and stepless transmission, and is expected to produce up to 300000 sets.

Investment Estimation and Fund SourceThe total investment of the Projectis 0.8 billion dollars, all self-raised funds for the enterprise.

Market AnalysisMain production currently the latest model of automotive automatic transmission products, will be applied mass car, audi and skoda brand of domestic models.Wide prospect of market, stable shipments.

Construction ConditionsXianghe emerging industry demonstration zone, close to the jingha highway exit, so the transportation is convenient, the implemented nine on a flat, construction conditions are ripe.

Benefit AnalysisAfter the construction of this Project, the yearly output value can reach 500 million dollars with the profit of 200 million dollars.

General Description of Chinese SponsorXianghe emerging industry demonstration zone is in the east of Beijing of 38 kilometers, close to jingha highway exit. With the provincial road in the zone, the transportation is convenient, and the investment environment is superior.

Cooperative FormJoint stuck, cooperation, sole proprietorship

 

The Projectof Beidou satellite positioning equipm***

 

Project ContentBeidou satellite positioning equipment manufacturing in the park construction Projects, production of professional civil beidou satellite positioning equipment and auxiliary equipment, is expected to produce up to 200000 se***

Investment Estimation and Fund SourceThe total investment of the Projectis 0.7 billion dollars.

Market AnalysisIn 2013, global satellite industry revenues of about $230 billion, including satellite application accounted for 91% .Preliminary forecast that by 2020, the industry alone in China will reach 4000-600 billion yu***

Construction ConditionsXianghe emerging industry demonstration zone, close to the jingha highway exit, so the transportation is convenient, the implemented nine on a flat, construction conditions are ripe.

Benefit AnalysisAfter the construction of this Project, the yearly output value can reach 500 million dollars with the profit of 200 million dollars.

General Description of Chinese SponsorXianghe emerging industry demonstration zone is in the east of Beijing of 38 kilometers, close to jingha highway exit. With the provincial road in the zone, the transportation is convenient, and the investment environment is superior.

Cooperative FormJoint stuck, cooperation, sole proprietorship

 

Langfang guangyang auto parts processing base

 

Project Content Project is located in langfang guangyang economic development zone, covers an area of 650 mu, total construction area of 346320 square meters, the construction of raw material accessories, production, logistics and distribution area, the assembly area, finished product area, research and development centers, office buildings and ancillary facilities and public facilities.

Investment Estimate and Financing SourceWith a total investment of 440 million dollars

Market AnalysisThe future for a period of time, the domestic demand for cars is still increasing. The Projectrelies on the Beijing and tianjin auto parts supporting both powerful production capacity, focus on the growing domestic automobile consumption market, meet the national industrial policy and industry development in hebei province, the formation of auto parts industry cluster and the complete industrial chain, and the surrounding areas to focus on supporting pillar automobile company. Will have good market economic and social benefits.

Construction ConditionsIndustrial district 40 kilometers from Beijing, 60 km away from tianjin, 70 kilometers from the capital airport and tianjin airport, 100 kilometers away from tianjin port, relying on central city and the airport, seaport economic development's unique geographical advantage. The capital international airport, tianjin international airport and tianjin xingang are within an hour's drive, can fully realize the highway, railway, sea and air multimodal transport requirements, development zone near more than 200 universities and more than 200 scientific research institutions, for the Projectconstruction provides a rich talent and technical resources.

Economic Benefit AnalysisThis the year after the completion of the Projectcan realize sales income is 3 billion yuan, can achieve the sales profit is 675 million yuan

FAX0086-316-25% return on investment, the investment capital is recovered in 5 years.

Cooperation FormJoint venture Foreign-owned enterprises Cooperative business

 

Industrial Robot Project Project DescriptionThis Projectcovers an area of 90 mu (equals to 6 hectares) and has the gross building area reaches 60,500 m2, including 30,000 m2 of plants, 10,000 m2 of office buildings, 12,000 m2 of multiple-use building

FAX0086-316-2,000m2 R&D center and 2,500 m2 of sales office, mainly for the construction of exhibition center and the production lines of robots for arc welding, spot welding and spray finishing.

Investment Estimated and Funding SourcesThis Projectis estimated to have total investment of USD 32.5 million. Take a variety of ways of cooperation .

Market AnalysisIt is explicitly indicated in Chinas Twelfth Five-year Plan of High-end Equipment Manufacturing Industry and the Twelfth Five-year Plan of Intelligent Manufacturing Equipments that it is industrial robot is an important content in the development of intelligent manufacturing equipments and an indispensable core equipment to realize high-end oriented development of our equipment manufacturing industry. Therefore, industrial robots will definitely play a major role in industrial upgrading and production model transformation of China’s manufacturing industry. By the end of 2011, China has 74,300 industrial robots running. However, there still exists a disparity of the use of industrial robots between China and some developed countries (The quantity in running is one tenth of Japan and one fourth of Germany). Supposing that China is going to have the same robot density as Germany, or Japan, over the next several years about 1 million new robots have to be installed, from which we can see the broad space of China’s industrial robot industry. It is estimated that, in the next few years, our average annual market size of our industrial robots will be over RMB 5-8 billion yuan. Therefore, no doubt, we can see this Projecthas a broad development spa***

Construction ConditionsThis Projectis planned to be located in Longhe High-tech Industry Zone, South Langfang, with total planning area of 28 square kilometers for Phase I. It is 40 kilometers and 60 kilometers distant from the downtown Beijing and Tianjin, respectively. It is successively appraised as Langfang Information Industry Base of National Plan for Medium- and Long-term Scientific and Technological Development, Provincial-level High-tech Industry Demonstration Zone and the first batch of Provincial-level Industry Clustering Zone. Under the premise of remarkable geographic advantage, well-established infrastructure can be used to meet construction needs of this Projectat various aspects.

Economic benefit analysisthe Projectpossesses a total investment of USD 32.5 million and it is estimated that its annual sales will top USD 27.6 million and profits will reach USD 8.85 million.

Cooperation modesolely-funded, joint venture or cooperation

 

ContactMa Jian Langfang Shengshi Construction Investment Co., Ltd.

FAX0086-316-2670888 Tel.0086-316-267***

E-mailshede666**[ta]**.com

 

Hydraulic System Project Project DescriptionThis Projectcovers an area of 90 mu and has gross building area of 48,000 m2. It takes advanced development technology of hydraulic elements to build 16 high-pressure fuel tank production lines

FAX0086-316-2 high-pressure pipeline production lines, four engineering machinery tank production lines. Yearly capacity is 400,000 by plan.

Investment Estimated and Funding SourcesTotal investment of this Projectis USD 48 million. Take a variety of ways of cooperation .

Market AnalysisAfter the 18th CPC National Congress, the development requirement of actively and yet prudently promoting urbanization has been encouraging the fast development of engineering machinery industry. Key engineering machinery components has always been a basic support, yet also the bottle neck of the development of the industry. When engineering machinery develops to a certain level, the high technical research of this industry will be mainly focused on some key parts and component such as engines, hydraulic system, transmission system and control system. As one of the key component of engineering machinery products, hydraulic elements can present overall operation performance and the overall efficiency of machines, but also they can be the main fault sources of the whole machines. For a long time, in the field of high-pressure high-flow hydraulic devices, products from domestic factories are still difficult to meet machinery factories’ requirements; especially for hydraulic system of excavators, manufacturers mainly use products made in Japan or Korea. According to statistics by the department concerned, the production value of hydraulic industry reached more than RMB 20 billion Yuan in 2012. The large amount of import also means alternative space. Therefore, this Projecthas a great development prospect.

Construction ConditionsThis Projectis planned to be located in Longhe High-tech Industry Zone, South Langfang, with total planning area of 28 square kilometers for Phase I. It is 40 kilometers and 60 kilometers distant from the downtown Beijing and Tianjin, respectively. It is successively appraised as Langfang Information Industry Base of National Plan for Medium- and Long-term Scientific and Technological Development, Provincial-level High-tech Industry Demonstration Zone and the first batch of Provincial-level Industry Clustering Zone. Under the premise of remarkable geographic advantage, well-established infrastructure can be used to meet construction needs of this Projectat various aspects.

 

Economic Efficiency AnalysisThis Projecthas a total investment of USD 48 million. By estimation, it can reach the annual sales revenue of USD 64 million and profit of USD 16 million.

Cooperation modesolely-funded, joint venture or cooperation

 

ContactMa Jian Langfang Shengshi Construction Investment Co., Ltd.

Tel.0086-316-267***

E-mailshede666**[ta]**.com

 

Environment-friendly Infusion Tube Project Project DescriptionThis Projectwill cover 200 mu, with total construction area of 150,000 square meters. Production equipment with annual output of 200 million environment-friendly infusion tubes, supportive facilities and environmental protection facilities will be built.

Investment Estimate and Fund SourceThe total investment in this Projectis 65 million U.S. dollars, including 40 million U.S. dollars self-financed by enterprise and 25 million U.S. dollars from proposed deployment.

Market AnalysisAt present, domestic demand volume for infusion tube is about 8 billion every year, including annual demand volume of 600 million infusion tubes in Hebei Province. Upon completion of this Project, sales revenue of 800 million yuan, production cost of 400 million yuan and pre-tax profit of 400 million yuan can be realized. This Projectis especially launched in echo with market development orientation.

Construction ConditionsThis Projectis planned to be located in Longhe High-tech Industry Zone, South Langfang, with total planning area of 28 square kilometers for Phase I. It is 40 kilometers and 60 kilometers distant from the downtown Beijing and Tianjin, respectively. It is successively appraised as Langfang Information Industry Base of National Plan for Medium- and Long-term Scientific and Technological Development, Provincial-level High-tech Industry Demonstration Zone and the first batch of Provincial-level Industry Clustering Zone. Under the premise of remarkable geographic advantage, well-established infrastructure can be used to meet construction needs of this Projectat various aspects.

Economic Profitability AnalysisThe total investment in this Projectis 400 million yuan. Enterprise will realize expected annual sales revenue of 220 million yuan and profit of 70 million yuan.

Cooperation modejoint venture or cooperation

Contact informationMa Jian

Tel.0086-316-267***

FAX0086-316-267***

E-mailshede666**[ta]**.com

 

Production of high-end Mercedes-Benz car dashboard and interior Project Project DescriptionThe total Projectcovers an area of 30.086 M. It will absorb luxury car brand manufacturers into the park after the completion of this Project.

Investment Estimated and Funding Sources16 million USD and all use of extra funds.

Market AnalysisProgram designed for high-end car interior accessories, and this company is a global supplier of mercedes-benz, there are many related enterprises around the Project, so as to build the Projecthas a lot of room to improve

Investment ConditionThe ProjectLocated in Anci Industrial Park,its the provincial high-tech industry agglomeration with the total planning area of 25 km2,located in southwest part of the urban area of Langfang city

FAX0086-316-2 km from urban area, borders the Mother River of Langfang City-Long he River on the north and connects with the suburban express way in the south. The south extension road of west outer ring, which is the vital communication line for the southwest part of Langfang City,runs through the Park from south to north.The roads in the Park are criss-cross and extend in all direction.

Economic benefit analysisThe Projectnormal annual sales income is 72 million dollars,the taxes is 0.8 million dollars.

Cooperation modesolely-funded

AddressLangfang Long Maohua Distripark Construction Investment Co., Ltd.

 

ACCC carbon fiber complex core conductor production

 

Project Contentthis Projectoccupies a land of 240 mu (16 hectares), including wire composite workshop, production workshop, finished product warehouse, R & D center, office building etc. Its annual production capacity reaches 4000 KM. This Projectadopts the advanced equipments such as Spinneret assembly machine, precision gear meter, polymerization kettle. Using advanced computer to design the system and analysis actual condition, it can satisfy the need of the market.

Investment Estimation and Capital SourceTotal investment of this Projectis USD 135 million, among which 80 million is from financing.

Market analysisChina is the second country to develop carbon fiber complex core lead wire technology, after the USA which started commercialization since 2004. This wire, realized energy saving, environmental protection and safe during power transmission, is an ideal substitute for traditional aluminum conductor of steel reinforced, Aluminum clad steel, aluminum alloy in power and electricity transmission system, which has many strengths such as light weight, high strength, low loss, high temperature resistance, compared with traditional conductor.

Investment ConditionThe Projectlocated in Hebei Langfang Emerging Industry Demonstration Area, which is located at the fringe area of Beijing, Tianjin and Hebei and the central part of Circum-Bohai Economic Circle; it is connected with Beijing in the north, adjacent to Tianjin

FAX0086-316-20km to Langfang urban area, 60km to Beijing and Tianjin respectively. Within the radius of 120km, it can reach 2 municipalities of Beijing and Tianjin, as well as 3 medium-sized cities of Tangshan, Baoding, Cangzhou. Located in the economic center of capital of China, the demonstration area has the flat and adequate land; the land would not involve removal of villages and towns, which is advantageous to the large scale development and construction.

Economic benefit analysisAfter the completion of the Project, it will realize annual sales income of USD167 million, paid taxes of USD17.6 million

FAX0086-316-200 people in employment.

Profile of the undertakerHebei Langfang Emerging Demonstration Area was approved by Hebei provincial government, with emerging industry agglomeration, high technology industry incubation and low carbon economy leading as the functional orientation, taking the development of new industries such as electronic information ,new material, new energy, high-end equipment manufacturing etc. as the direction.

Cooperation ModeJoint venture or cooperation

Contact InformationMS. Song Wenjuan

TEL1523164***

FAX0086- 316- 257***

E-mail2359407638**[ta]**com

 

AddHebei Langfang Emerging Industry Demonstration Area Guokai Xinan Investment Co.Ltd.

 

Robots and robot complete system Project Project ContentThe Projectoccupies a land of 300mu, including system R & D and production center, testing workshop, production workshop, office building etc. After the completion of the Project, the annual production capacity reaches 500 sets of industrial robots and 100 sets of robot complete system. The Projecttechnology and equipment used mainly consists of manipulator design, software development, circuit design, aerodynamic design, and the use of advanced computer design system, CAD, 3D design model show and analysis of actual condition. Continuously improving and launching the new products to meet market and customer needs.

Investment Estimation and Capital SourceTotal investment of this Projectis USD 127 million, among which 63 million is from financing.

Market analysisRoot industry is the integration of industry system, advanced manufacturing, precision supporting, which needing technology, manufacturing and R&D. In view of the development of China's machine industry chain, core technical limitations are the largest obstacle. At present, China industrial robot obtained a breakthrough in the field of system integration. This Projectcan form a strong sustainable development and good market competition.

Investment ConditionThe Projectlocated in Hebei Langfang Emerging Industry Demonstration Area. This area is located at the fringe area of Beijing, Tianjin and Hebei and the central area of Circum-Bohai Economic Circle; it is connected with Beijing in the north, adjacent to Tianjin

FAX0086-316-20km to Langfang urban area, 60km to Beijing and Tianjin respectively. Within the radius of 120km, it can reach 2 municipalities of Beijing and Tianjin, as well as 3 medium-sized cities of Tangshan, Baoding, Cangzhou. Located in the economic center of capital of China, the demonstration area has the flat and adequate land; the land would not involve removal of villages and towns, which is advantageous to the large scale development and construction.

Economic benefit analysisafter the completion of the Project, it will realize annual sales income of USD380million, paid taxes of USD40 million

FAX0086-316-200 people in employment.

Profile of the undertakerHebei Langfang Emerging Demonstration Area was approved by Hebei provincial government, with emerging industry agglomeration, high technology industry incubation and low carbon economy leading as the functional orientation, taking the development of new industries such as electronic information ,new material, new energy, high-end equipment manufacturing etc. as the direction.

Cooperation ModeJoint venture or cooperation

Contact InformationMS. Song Wenjuan

TEL1523164***

FAX86-316-257***

E-mail2359407638**[ta]**com

 

項(xiàng)目合作:18361148798    或 點(diǎn)擊這里給我發(fā)消息
溫馨提示:本站提供免費(fèi)發(fā)布服務(wù),但對(duì)信息的合法性、實(shí)時(shí)性、真實(shí)性和完整性,不承擔(dān)任何責(zé)任。名錄資源由會(huì)員為向全球展示品牌形象上傳,個(gè)人信息均經(jīng)處理后發(fā)布,如有遺漏戓涉嫌侵權(quán)他人及不愿展示形象的,請(qǐng)將“該頁網(wǎng)址和需修改及刪除的內(nèi)容”發(fā)至本站郵箱戓留言給我們處理。凡注冊(cè)會(huì)員并發(fā)布信息或名錄資源的,均可定期獲得全球項(xiàng)目參考及合作機(jī)會(huì)。本站名錄資源概不對(duì)任何第三方開放,更不提供如交換、出售及查詢等服務(wù)!
項(xiàng)目合作及建議請(qǐng)留言:請(qǐng)理性留言,并遵守相關(guān)規(guī)定
姓名: 手機(jī): QQ號(hào): 微信: 郵箱:
驗(yàn)證碼 點(diǎn)此換一張
關(guān)于我們 招商培訓(xùn) 代理招商 代理投資 代理融資 代理政策 戰(zhàn)略伙伴 服務(wù)外包
廣告報(bào)價(jià) 匯款方式 合作方式 免費(fèi)發(fā)布 網(wǎng)群建設(shè) 誠聘英才 網(wǎng)站導(dǎo)航 設(shè)為首頁