中國招商引資信息網(wǎng),招商引資信息網(wǎng),招商引資網(wǎng),招商投資網(wǎng),招商網(wǎng),招商投資集群,招商投資全球集群,招商投資全球集群總站,
三河開發(fā)區(qū)招商引資網(wǎng)
廊坊市招商引資項目匯總468—21
來源:網(wǎng)群國際    瀏覽:

Brief introduction of an annual output of 50000 tons of steel structure products and300 sets of environmental protection equipment Project Project contentThe total planning area of 198 acres of land. The main contents of Constructionstorage area, production workshop and office facilities etc..

Investment estimation and fund sourcesthe total investment of the Projectis aboutRMB $9676200, the $1612800 funding gap.

Market analysisFirst introduced as a fully enclosed clean hot dip galvanizing production line of business, as a hot dip zinc environmental protection equipment system solutions provider, service provider, the company always adhere to the build a world-class metenvironmental protection equipment system service provider as its mission, toenvironmental protection technology development as the core of enterprise development, after years of painstaking research and practice, set the world the most advanced hot galvanizing technology, development of full closed clean hot dip galvanizing production line. The production line is currently has 9 patents, of which type ZHC-50K water curtain dust processing equipment and ZHS-30 acid (gas)absorption treatment equipment have passed Beijing Institute of ring MA DetectionCenter for environmental technology. Research, design, development, manufacturingcompany is mainly engaged in full closed clean hot dip galvanizing production line, as well as the power tower, steel, electric power fittings manufacturing business, products with clean environmental protection, energy saving, economic cycle, safe and efficientcharacteristics. The company is located in the center of Golden Triangle Tianjin HebeiLangfang Yongqing Taiwan Industrial Park, convenient transportation, beautiful environment, advanced communications. The establishment of surface coating testcenter on 2013, the national iron and steel corrosion experiment base, and Beijingiron and Steel Group Limited company of fine special friendly cooperation.

Construction conditionsConstruction conforms to the national and industrial policies of Hebei Province, the construction scale is suitable, the product structure to adapt to market changes. Theprocess technology and equipment with the leading domestic level, high degree of automation, product quality, reliable technology.

Economic benefit analysisThe Projectis put into production, the expected annual sales income of about$9660000. The annual tax of about $289***

Sponsor surveyHebei Zhuoyi environmental protection equipment Co., Ltd., founded in 2008 May, the legal representativeZhang Zhihong, the main businessenvironmental protection equipment production, sales. In 2009 the company obtained the utility model patent certificate, ISO9001, ISO14001, OHSAS18001 standards to control plant, to provideconsistency in the quality of products for the customers of all staff working target.

Cooperation modejoint venture development

ContactZhang Zhihong

Contact

TEL1593166***

E-mailzycyl2009**[ta]**.com

 

AddressYongqing County, Langfang City, Taiwan Industrial City Station Road

 

The Projectof Annually output of 500,000 Steel Structure Workshop Section

 

ProjectContentThe Projectcovers an area of 30 mu with the area of storehouses, manufacturing plants and office buildings amounting to 20000, and the purchase 110 sets of equipment. Once in production, its production capacity can reach 500,000steel structure workshop section annually.

Investment Estimation and Fund SourceThe total investment of the Projectis 25 million US dollars.

Market AnalysisRecent years, with the changing of the steel import and export situation of our country, the volume of imports is decreasing with every passing year while the volume of exports is increasing, indicating that our country has become a net exporter for a net importer, nevertheless, what following is the increasing international trade frictions. The profits and added values of steel structure exports are high, there is a broad prospects of steel structure export trade if we can avoid international frictions effectively. In the light of the global market, the increase of overseas demand for steel structure in future is reflected in the following several aspectsthe first one is the acceleration of the conventionally-fired power plant construction, which means that steel consumption for main plants and boiler steel frame (including nuclear power plants and wind power generation) will increase; the second is the bridges in traffic engineering will increase. Recent years, steel structure adopts in highway bridges has become a main developing trend, especially the bridges over seas and rivers which adopt steel structure a lot. In addition, the steel structure uses in guardrails, toll stations, and traffic signs is increasingthe third one is the steel structure uses in municipal constructions is increasing, such as metro and light rail Projects, urban overpasses, viaducts, environmental protection, city public installations and temporary buildings which adopt steel structures increasingly. The fourth one is the steel residential buildings will increase. Many countries have advocated the construction of energy - saving and land - saving housing, the pilot Projectof steel structure residence, the design of specifications and supporting technology and basic materials. Expanding the varieties of steels that used in construction steel structure positively, improving product property, the prospect of our domestic steel structure export will remain positive. With the overseas market demand changing faster and faster, the market competition is becoming increasingly fierce.

Construction ConditionsThe site selection address is in the southern Yuanqu road of new industrial district of Wenan with convenient traffic and proper construction land.

 

Benefit AnalysisOnce in production, the sale proceeds will reach 31,120,000 dollars and the profit and tax 2,150,000 dollars.

General Description of Chinese SponsorBeijing Tianya steel structure Corporation was set up in 2000, mainly involved in the design, manufacture, construction, and installation of steel building structure, the registered address is the new industrial district of Wen’an, the whole corporation has 155 employers with the total assets be 483,000,000yuan. This corporation mainly contracts the construction of various kinds of industrial and civil construction steel structure. The corporation has always being provided the adding layer, transformation of steel structure , steel structure platform, attic and other construction Projects, providing steel structure engineering for floor reinforcement, factory workshops, warehouses and industrial and civil fields, provided steel structure and decoration engineering and metal shaped engineering for fields like ladders, railings, handrails, Partitions, sunlight rooms, steel canopies, vestibules, corridors; and provided steel structure maintenance engineering for color steel and roof boarding.

Cooperative FormJoint venture or cooperation or sole proprietorship

 

Contact personZhang Song

TEL0086-1861387***

FAX0086-316-539***

AddressWenan Industry New District

Post Code06***

E-mailxwnc588**[ta]**.com

 

The Projectof Metro Control Gate Production

 

ProjectContentThe total construction area is 35000 square maters, including factory buildings, comprehensive office buildings and storehouses.In this Project, we use the world first-class technology and equipments to produce the metro control door and the metro barrier door.This product is applied in metro construction in some large city, such as Beijing,Shanghai,and Xi’an.

Investment Estimation and Fund SourceThe total investment is 40 million dollars. All the finance should be collected by yourself.

Market AnalysisAt present, China's large and medium-sized city widespread some phenomena, such as traffic jam, cars congestion and traffic chaos, that become the bottleneck(the most difficult) problem for city development.To guide citizens to use the public transportation system, especially the metro. This is the overseas large city’s successful experiences of solving the city transportation problems, and these experiences must be the only route to slove our nation’s transportation problems.

Construction ConditionsFlat land, nine connections and one smooth ,convenient transportation.

Benefit AnalysisThe Projectcan fulfill the output value 20 million dollars, sales revenue 20million dollars, profit and tax 1.5 million dollars.

General Description of Chinese SponsorWenan economic development zone is located on the north of the county of Wenan county, east is near the Langcang highway.In 2011.7, it was approved as a provincial development zone which focus on developing equipment manufacturing, electronic information, new energy, new materials, auto parts four big industries.

Cooperative FormJoint venture or cooperation

 

Contact personHe Yanbin

TEL0086-316-528***

FAX0086-316- 528***

AddressNo. 231 Fengli Road,Wenan county, Hebei Province

Post Code06***

 

The Projectof Electric Actuators Production

 

Project ContentThe Projectis planning to construct a floorage of 20000 square meters of workshops, storehouses and synthesized office buildings. The products are widely used in the automatic control system of power stations, oil, steel, metallurgy, chemical industry,oil and gas transmission pipeline, sewage treatment.

Investment Estimation and Fund SourceThe total investment of the Projectis 20 million dollars, and plan to bring in 20 million dollars of foreign investment.

Market AnalysisThe products are widely used in the automatic control system of power stations, oil, steel, metallurgy, chemical industry, oil and gas transmission pipeline, sewage treatment, so they have a prospect market.

Construction ConditionsFlat land, nine connections and one smooth, convenient transportation.

Benefit AnalysisThe Projectcan fulfill the output value of 40million dollars, sales revenue of 40million dollars, profit and tax of 2 million dollars.

General Description of Chinese SponsorWenan economic development zone is located on the north of the county of Wenan county, east is near the Langcang highway.In 2011.7, it was approved as a provincial development zone which focus on developing equipment manufacturing, electronic information, new energy, new materials, auto parts four big industries.

Cooperative FormCooperation or sole proprietorship

 

Contact personSun Guohui

TEL0086-316-528***

FAX0086-316-528***

AddressNo. 231 Fengli Road ,Wenan County, Hebei Province

 

The Projectof Elevator Lifter Production

 

Project ContentThe Projectis planning to construct a floorage of 10000 square meters of workshops, storehouses and synthesized office buildings. It will adopt international advanced technology and equipment to produce the elevator and lifter. The product mainly apply to the construction and operation of high-rise residential area, office building, hospital and school.

Investment Estimation and Fund SourceThe total investment of the Projectis 10 million dollars, the enterprise self-raised capital and cooperation.

Market AnalysisChina is in the period of the construction and development cycle, the existence of large numbers of high-rise building shows the great demand of using elevator and lifter in market.

Construction ConditionsFlat land, nine connections and one smooth ,convenient transportation.

Benefit AnalysisThe Projectcan fulfill the output value 20 million dollars, sales revenue 20million dollars, profit and tax 1.5 million dollars.

General Description of Chinese SponsorWenan economic development zone is located on the north of the county of Wenan county, east is near the Langcang highway.In 2011.7, it was approved as a provincial development zone which focus on developing equipment manufacturing, electronic information, new energy, new materials, auto parts four big industries.

Cooperative FormJoint venture or cooperation

 

The Projectof Annual Output of 800KVA Amorphous Alloy Transformer

 

ProjectContentsThe Projectcovers an area of 50 mu, planning to construct a floorage of 26700 square meters and surface hardening of 4000 square meters. Green area reaches to 75%, plot ratio reaches to 80%. Also it will purchase 165 sets of equipment.

Investment Estimation and Fund SourceThe total investment of the Projectis 24.16 million dollars and attract other investment 7.5million dollars.

Market AnalysisAs the development of Chinas economy, Electricity demand appear a rapid growth trend. The market demand gap of environmentally friendly transformer is so large . It can present at many society units ,such as agency, business, community, factories and mines enterprises, schools. Amorphous alloy transformer is the most advanced and energy-saving products in our China with huge potential in market development.

Construction ConditionsThe Projectsite is Hebei Wenan Suqiao Cui jia fang industrial park, where is about 110 kilometers away from Beijing and Tianjin, and with abundant resources, convenient traffic and advanced communication.

Benefit AnalysisOnce in production, the Projectcan form the capacity of annual output of 800KVA Amorphous alloy transformer and 2000 units of Box-type substation.

General Description of Chinese SponsorLangfang Tian hua transformer manufacturing co., LTD. Is a private enterprise, which mainly produces amorphous transformer and dry type transformer and its products mainly apply to HuaBei bureau bidding and the national industrial and mining enterprises and the community subway. The company has the asset of 5 million dollars, 80 employees, once was titled as Wen'an county the star enterprise and creditworthy company of Hebei province.

Cooperative FormJoint venture or cooperation

 

Contact personHuang Xueyun

TEL0086-1383361***

 

Post Code06***

 

Cold Storage and Logistics Base

 

Project DescriptionTo cover an area of 50 MU to build cold storage room, office building and ancillary facilities.

Investment Estimate and SourcesThe total investment amounts to 25 million USD, among which 10 million USD will be solicited.

Market AnalysisAs a modern agricultural product cold storage and logistic base, it has a good market prospect.

Construction ConditionsInfrastructure is completed, land leveled and transportation convenient.

Economic ReturnsWhen putting into operation, sales revenues is estimated to reach up to 60 million UDS, tax 15 million USD.

Chinese PartnerSanhe Industrial Park, the owner of this base, enjoys favorable geographical location with its seat in the east 45 kilometers away from Beijing Tiananmen and the Beijing Capital International Airport respectively. It has a well-developed transportation network with 102 National Highway, Jingqin Railway, Mizhuo Highway, Misan Highway, Daqin railway running through the area. Many enterprises have been settled down in the park.

Cooperation ModeCooperation and Co-fund

ContactsLU Nan

TEL0086-316-3459***

 

Logistics in Bonded Area

 

Project DescriptionTo build a Bonded Free Trade Zone, where the offshore financial policy practise, funds are free to come and go, there are bonded warehouse to provide warehousing, processing, distribution and other services for the park.

Investment Estimate and SourcesThe total investment amounts to 0.48 billion USD.

Market AnalysisBonded logistics Projectnot only provide bonded service function, and the use of modern logistics concept, to promote the development of the local import and export business, its purpose is the use of bonded logistics functions, promote the development of logistics industry, and then promote the development of local economy.

Construction ConditionsSanhe New Industrial Park is located in Beijing east the hinterland, east of Sanhe City, west of Yanjiao national hi tech Industrial Development Zone, south of Dachang Hui Autonomous County, north of Pinggu Economic Development Zone in Beijing. There are Jinqin, Jingping two high-speed roads, 102 National Road and Jiangtan road running from east to west, Jingpin railway branch line, Sanping road and S3 railroad surronding the park. There is one airport under planning.

Economic ReturnsWhen putting into operation, the annual sales revenues is estimated to reach up to 500 million RMB, profit 200 million RMB.

Chinese PartnerSanhe New Industrial Park has a planning area of 48.67 square kilometers with the starting area covering an area of 9.61 square kilometers. It aims to be high-end service oriented, composite industrial base; combine R&D and business activitites, intelligent park innovation development; blue and green ecological green vall***

Cooperation ModeCooperation and Co-fund

ContactsSHI Zhanfeng

TEL0086-10-5264***

FAX0086-10-5264***

E-mailshxinxingchanye**[ta]**.com

 

Xianghe Modern Logistics Park

 

Project contentThe Projectplanned to be located west of the Canal Road, Canal Island portal image (Welcome Place) south of the area. The total area of 1500 mu, total construction area of 1.33 million square meters. Divided into three functional areas, including the integration of functional areas of logistics, trade and business function areas and integrated support functional areas.

Total Investment and Capital Sourcesthe total investment is 1.28 billion US dollars, all of the use of extra funds.

Market analysisThe Projectis a freight forwarding, information exchange, financial settlement, interim storage, distribution processing, brand display, research and development in one of the regional modern logistics park. Major service at home and raw materials industries, and involve textiles and clothing, auto parts, decorative materials, food, agricultural and other industries.

Analysis of Economic benefitsThe property tax is expected to achieve about 10 billion

FAX0086-316-2 billion construction tax, transaction tax of about 9 million new jobs, the number of nearly 4 million people.

Cooperation Modeforeign-owned enterprise

 

The Projectof New Watson logistics center

 

Project ContentThe Projectcovers an area of 135334 m2 (203 mu).Among thembuilding covers an area of 101381 m2, green area of 22024.80 m2, road and parking area 11928.20 .Construction area of 143409 m2.

Investment Estimation and Fund SourceThe Projecttotal investment estimate of $437.64 million.

Market AnalysisDecoration industry get fast development at present, as the foundation of the Projectconstruction to provide a wide range of markets, xianghe located in the hinterland of Beijing and tianjin, the geographical position is superior, the traffic is very convenient, it will provide very convenient conditions for the Projectconstruction.

Construction ConditionsNorth of Projectsite selection in XiangHeXian silk street east, 45 kilometers from downtown Beijing, 60 kilometers from the capital airport, 70 km away from tianjin airport, 110 kilometers away from tianjin xingang port.

Benefit AnalysisAfter the completion of the Projectis expected annual through put reaches 15000 tons, sales income of $174.6 million, $112.24 million, $35.05 million over taxes.

General Description of Chinese SponsorGather new treasure new decorative material co., LTD is a modern management system of large private enterprises.The company covers an area of 23000 square meters, staff 23000 people, fixed assets of 85 million yuan, has a modern standard two artificial stone production lines, annual output of stone, 500000 copies.

Cooperative Form

 

Contact personWang zhisen

TEL1362316***

FAX0086-316-878***

AddressXiangHeXian eastern silk street south

Post Code06***

E-mailxhhsjxb**[ta]**.com

 

Guangyang Logistics Industry Base

 

ContentThe Projectcovering an area of 3000 mu is located in Guangyang Industry Cluster Area. Its total construction is 1800000 square meters, composed of 300 standard workshops and 60 storerooms.

Investment Estimate and Financing SourceThe estimation of total investment is 55 thousand US dollars and all introduce foreign capital.

Market AnalysisGuangyang Industry Cluster Area and the surrounding logistics industry led by Weihang Logistics, Steel Market and China Post moved into the park, supported by the special railway and the Second Capital International Airport, will develop rapidly.

Construction ConditionsGuangyang Industry Cluster Area is located in southeast Langfang known as a pearl between Beijing and Tianjin, northward to Langfang Development Zone, southward to FOXCONN Industrial Park, west on downtown, east on Tianjin. The goods yard of Beijing-Shanghai High-speed Railway and the Langfang Exit of Jing-Jin-Tang Express Way are near at hand. The unique geographical advantage, 40 kilometers away from Beijing, 60 kilometers from Tianjin, 70 kilometers to Beijing International Airport and Tianjin Airport, 100 kilometers from Tianjin Port, makes it possible to develop economy supported by central cities, air harbour and seaport. One hour’s drive to Capital International Airport, Tianjin International Airport and Tianjin Xingang can fully achieve the combined transport through highway, railway, land-sea and air.

Economic Benefit AnalysisThis Projectis able to bring about yearly sales income 8 million US dollars, with profit 1.28 million US dollars, the investment rate is 22.8% and the investment capital can be recovered in 4.38 years.

Investment EnvironmentIn order to adapt to the rapid development of Bohai Economic Circle and the trend of internationalized, incorporated regional economy, Guangyang Industry Cluster Area is built to be a leading base of modern logistics, high and new technology and advanced manufacturing industry in hebei province. The industrial area with general planning area 28 square kilometers lies in the southeast Langfang city, and the first-stage 11.6 square kilometers has been planned into the overall urban planning and land use of langfang. In the only industrial stretch in the heart of Beijing-Tianjin-Hebei area, 6000 mu has been collected, and there are two longitudinal, three horizontal main lines reaching to 15 kilometers length. Seven Connections and One Leveling is thoroughly implemented.

Cooperation FormForeign-owned enterprises

 

項目合作:18361148798    或 點擊這里給我發(fā)消息
溫馨提示:本站提供免費發(fā)布服務,但對信息的合法性、實時性、真實性和完整性,不承擔任何責任。名錄資源由會員為向全球展示品牌形象上傳,個人信息均經(jīng)處理后發(fā)布,如有遺漏戓涉嫌侵權(quán)他人及不愿展示形象的,請將“該頁網(wǎng)址和需修改及刪除的內(nèi)容”發(fā)至本站郵箱戓留言給我們處理。凡注冊會員并發(fā)布信息或名錄資源的,均可定期獲得全球項目參考及合作機會。本站名錄資源概不對任何第三方開放,更不提供如交換、出售及查詢等服務!
項目合作及建議請留言:請理性留言,并遵守相關(guān)規(guī)定
姓名: 手機: QQ號: 微信: 郵箱:
驗證碼 點此換一張
關(guān)于我們 招商培訓 代理招商 代理投資 代理融資 代理政策 戰(zhàn)略伙伴 服務外包
廣告報價 匯款方式 合作方式 免費發(fā)布 網(wǎng)群建設 誠聘英才 網(wǎng)站導航 設為首頁